Details

  • Location:Hartlepool
  • Sector:New Build
  • Duration:22 Weeks
  • Circa:£600,000

Overview

Design and construction of Costa Coffee Drive-Thru building to Shell including site strip of the existing surface to reduced levels, piled foundations, ground beams, suspended beam and block floor, external works including hardstanding area, Drive-Thru route, line marking, soft landscaping, external refuse storage areas, external lighting and associated services and drainage, connection to associated mains service supplies. Steel frame, masonry works, build up cladding roof system and gutters, single ply roofing to servery, through colour render, cedar cladding, aluminium windows and doors, steel fire exit door.