Phase 1 & 2 – Design & Build.

New build of a 6th form block including piled foundations, steel frame, precast suspended floors, brickwork, curtain walling, flat roofing, M&E installations and finishes. Refurbishment of existing library block, reconfiguration of layout, formation of toilet facilities and services connections, M&E installations, full replastering, decoration, suspended ceiling and floor finishes, including knock through into Phase 1 building.
Contract value £1.15M.

Pupil Entrance

Demolition of classrooms to open up entrance foyer, replacement aluminium door sets, suspended ceiling, recessed lighting, glazed canopy, floor covering with detail design, feature wall, decorations.
Contract value £72,000.00

Art block

Removal of existing asbestos canopy and construction of new build including foundations, masonry elevations and glazing, steel and timber pitched roof construction, felt roof coverings with lantern lights and internal fit-out.
Contract value £162,000.00